Australian Technology Park, Eveleigh NSW

In 2013, Heritage 21 prepared an Interpretation Strategy for Bays 1& 2 at the Eveleigh Locomotive Workshops, For this study, Heritage 21 interviewed a number of stakeholders and designed an interpretation strategy to bring more visitors, both local and foreign, and conference delegates to the last two remaining bays of the workshops. The strategy involved live blacksmithing demonstrations, the use of original tools used in the workshops during the early 20th Century and displays of equipment, together with guided school and college tours of the premises and interpretation signage throughout.

Enquire

Brief:

Contact

  • fb
  • insta
  • linked_in
  • pintrest