Signage - Transport for NSW

Have a question?
Need assistance?

Have a similar project that you need assistance with? Complete the form below and one of our Heritage assessment specialists will be in touch as soon as possible.

  • This field is for validation purposes and should be left unchanged.
By signing in you agree with the Terms and Conditions and Privacy Policy

Professional Associations

About the project
Key Details
  • About The Project

    Heritage 21 was a consultant to ‘Central Signs’ for this 3 – year long project. Heritage 21’s role was to advise Central Signs on the best locations for signage at the stations and fixing methods to existing building fabric that would generate the least amount of heritage impact as possible. There were more than thirty stations involved throughout New South Wales.

  • What was done

    Each station was inspected by Heritage 21 prior to the application of signage. Each signage type and its fixing was discussed with Central Signs. Heritage 21 examined shop drawings for individual fixings of signs to various stations and commented with heritage advise pursuant to the reduction of impacts. After the signs were installed, Heritage 21 inspected the stations and provided certification upon completion of the works all meetings were recorded and inspections photographed so as to provide evidence of the condition extent.

  • Time frame

    3 years

Services provided
  • Onsite inspection of each station
  • Discussion with Central Signs on best positions and installation methodologies in order to reduce heritage impact
  • Examination of shop drawings
  • Examination of shop drawings
  • Certification
Why was the work undertaken?

Transport for NSW rolled out a State-wide station signage upgrade. The selected contractor (Central Signs) was required to appoint a heritage consultant to ensure that positions of signs and fixing methodologies conformed to the signage guideline manual produced by Transport for NSW. Later, it was necessary to certify the works upon completion. Heritage 21 fulfilled this role.

Who was the work completed for?

Transport for NSW

Outcome

The outcome of the project was to facilitate the installation of the required signs in a manner capable of achieving best heritage practice.

 

 

View gallery Get in touch

What our clients
& partners say:

“'I have had some involvement with Heritage 21 in working through the design and documentation currently taking place at the Exchange Hotel in Balmain, and have appreciated the ability to provide recommendation on potential design outcomes that are able to be supported as consistent with heritage requirements' ”

Liam Corr
Registered Architect

“It has also been a pleasure working with Paul and your team on this project. To be honest, I had not done heritage projects before and it was only through Paul and your team’s guidance that allowed me to complete this project at a high standard. I am now confident in doing heritage projects like this and I look forward to the next project that we can work on together. Again, thank Paul and Divya patience and professional advice throughout the process. ”

Eddie Lam
Builder

“Really appreciate the help in responding the RFIs. I acknowledge all the work that was required and that you put into that report. Maddocks said you made their job easy! ”

Max Symonds
Development Manager - Metro Property Development

“Just as client-side project manager for Honey Insurance, I would to let you know that it has been a very positive experience and appreciate your quick responses and quality of work from you and your organisation thus far. ”

Nick Maric
Project Management

“I just wanted to share the good news that Canterbury-Bankstown Council has decided to withdraw the development control order issued to our client. The report you prepared was pivotal in this decision by the Council. Many thanks to you, Paul and the team for your work on this. ”

Anna Lindeman-Jones
Senior Associate - Addisons

“I'd like to thank Paul and Lauren for their dedication, persistence and well thought through support and substantiation of the design merits of our development proposal; it is no easy feat to have a new building approved in a heritage conservation area, and particularly adjacent to heritage items. ”

Tim McLachlan
Development Manager

“I consider that we have a well prepared case that has been cogently articulated by Paul and Michael. It is a fraught experience for us, however we do appreciate the input from top professionals such as Paul ”

Richard Mann
Registered Architect

“Hi team at Heritage 21 I just wanted to say thanks for all your hard work on Mosman and being so responsive etc. One of our team recommended you and I have been very happy with the service provided. ”

Di Jones
Principal - Linked Project Management

“We would also like to take a quick moment to thank you all for your contribution to the project and we will update you on any developments as necessary”

Jose Serrao
Registered Architect

“Dear Heritage 21 team, I am please to advise that all the work prepared by your team has satisfied council’s contentions. We definitely know who to come to next time for heritage matters. ”

Andres Caceres
Level 33

“Thank you for all your work preparing this Statement of Heritage. I sat down yesterday and had a good read cover to cover, and felt very appreciative of your level of research and detailed consideration of our requirements.”

Veechi
Varuna', Katoomba

“Just wanted to let you know, Council agreed with us in our application to reinstate the front facade! I am so excited. I wanted to thank you for all your help in getting this across the line. ”

Jane Frawley

“It has been a pleasure to work with you and your team as well!”

Georgia
Holding Redlich

“Dear Heritage 21 team - This is an excellent result, thank you for all your work.”

Sevda Cemil
Midson

“Sites with heritage values present great opportunities, however often can be easily derailed if clear, concise and timely advice is not provide at the earliest stages of site planning. I have worked with Heritage 21 over numerous projects across Sydney and have found them to be valuable project partners in the development process. ”

Vince Hardy
Urban Planning Consultant, Cityscapeplanning+projects

Path-2-rev Group%204%20Copy Group%204
Need help getting started?

Check out our guides.

article-1
Heritage – are we losing the battle?

Since the robust days of the 1970s and the 1980s during which NSW governments and councils committed wholeheartedly and enthusiastically…

Read more
article-1
Five things you need to know about cultural built heritage

Having worked in the heritage space for the better part of thirty years, I have come to rely upon five…

Read more
article-1
Incentivising Ownership of Heritage Buildings

In response to the recent enquiry by the government relating to the NSW Heritage Act, I made the following recommendation.…

Read more

526dad159320ae83e6a08364079da7b7a1b6ece0

Complete the form below to contact us today.

  • This field is for validation purposes and should be left unchanged.
By signing in you agree with the Terms and Conditions and Privacy Policy