About the project
Key Details
  • About The Project

    Heritage 21 was a consultant to ‘Central Signs’ for this 3 – year long project. Heritage 21’s role was to advise Central Signs on the best locations for signage at the stations and fixing methods to existing building fabric that would generate the least amount of heritage impact as possible. There were more than thirty stations involved throughout New South Wales.

  • What was done

    Each station was inspected by Heritage 21 prior to the application of signage. Each signage type and its fixing was discussed with Central Signs. Heritage 21 examined shop drawings for individual fixings of signs to various stations and commented with heritage advise pursuant to the reduction of impacts. After the signs were installed, Heritage 21 inspected the stations and provided certification upon completion of the works all meetings were recorded and inspections photographed so as to provide evidence of the condition extent.

  • Time frame

    3 years

Services provided
  • Onsite inspection of each station
  • Discussion with Central Signs on best positions and installation methodologies in order to reduce heritage impact
  • Examination of shop drawings
  • Examination of shop drawings
  • Certification
Why was the work undertaken?

Transport for NSW rolled out a State-wide station signage upgrade. The selected contractor (Central Signs) was required to appoint a heritage consultant to ensure that positions of signs and fixing methodologies conformed to the signage guideline manual produced by Transport for NSW. Later, it was necessary to certify the works upon completion. Heritage 21 fulfilled this role.

Who was the work completed for?

Transport for NSW

Outcome

The outcome of the project was to facilitate the installation of the required signs in a manner capable of achieving best heritage practice.

 

 

View gallery Get in touch

What our clients
& partners say:

“We would also like to take a quick moment to thank you all for your contribution to the project and we will update you on any developments as necessary”

Jose Serrao
Registered Architect

“Dear Heritage 21 team, I am please to advise that all the work prepared by your team has satisfied council’s contentions. We definitely know who to come to next time for heritage matters. ”

Andres Caceres
Level 33

“Thank you for all your work preparing this Statement of Heritage. I sat down yesterday and had a good read cover to cover, and felt very appreciative of your level of research and detailed consideration of our requirements.”

Veechi
Varuna', Katoomba

“Just wanted to let you know, Council agreed with us in our application to reinstate the front facade! I am so excited. I wanted to thank you for all your help in getting this across the line. ”

Jane Frawley

“It has been a pleasure to work with you and your team as well!”

Georgia
Holding Redlich

“Dear Heritage 21 team - This is an excellent result, thank you for all your work.”

Sevda Cemil
Midson

“Sites with heritage values present great opportunities, however often can be easily derailed if clear, concise and timely advice is not provide at the earliest stages of site planning. I have worked with Heritage 21 over numerous projects across Sydney and have found them to be valuable project partners in the development process. ”

Vince Hardy
Urban Planning Consultant, Cityscapeplanning+projects


526dad159320ae83e6a08364079da7b7a1b6ece0

Complete the form below to contact us today.

  • This field is for validation purposes and should be left unchanged.
By signing in you agree with the Terms and Conditions and Privacy Policy